Building 1

22,000 sq. ft. Built in 1980 – Single storey industrial warehouse with two storey office section.

ARCHITECTURAL STYLE

Single storey industrial warehouse with two storey office section.

YEAR BUILT

1980

BUILDING BASE AREA

1,997.8 m2

Structural steel building, metal siding, 600v 225amp power, washrooms, showers, a/c, sprinklers. Office area c/w desks, filing cabinets, etc

Foundation
Poured concrete

Walls
Steel insulated sandwich panels

Frame
Steel

Roof
Tar and gravel finish on steel, Q-decking on open web steel joists.

Insulation – Walls
Fiberglass in walls

Insulation – Roof
Rigid insulation

Windows
Double glazed windows in aluminum frames. (New windows in 2006)

Doors
Double entrance doors: one set glazed in aluminum frame. Individual doors: eight metal faced in metal frames Vehicular doors: nine metal panel overhead type doors

Chimney
None

Fire escapes/exterior staircases
None

Downspouts and guttering
None

Porches and steps
None

Structural repair
Good

Paintwork
Good

Basement
Good

Ground Floor
Washrooms and locker rooms:

Floor
Quarry tile and vct tile

Walls
Ceramic tile in washrooms. Painted concrete block in locker room

Ceilings
Exposed open web joists and decking

Doors & Trim
Solid core doors with metal trim

Clear Height
2.5m

Offices in workshop sections:

Floor
Poured concrete and vct tile

Walls
Painted concrete block and gyproc.

Ceilings
Suspended ‘T’ bar with acoustic tile and painted gyproc

Doors & Trim
Solid core doors with metal trim

Clear Height
2.4m

Finished space (remainder):

Floor
Vct tile

Walls
Painted concrete block and gyproc

Ceilings
Suspended ‘T’ bar with acoustic tile

Doors & Trim
Solid core doors with metal trim

Clear Height
2.5m

Woodworking shop:

Floor
Poured Concrete

Walls
Painted concrete block

Ceilings
Painted gyproc

Doors & Trim
Solid core doors with metal trim

Clear Height
2.5m

Unfinished space (remainder):

Floor
Poured Concrete

Walls
Concrete block

Ceilings
Exposed open web joists

Doors & Trim
Solid core doors with metal trim

Clear Height
6.93m

Washrooms:
Floor
Quarry tile

Walls
Ceramic tile

Ceilings
Suspended ‘T’ bar with acoustic tile

Doors & Trim
Solid core doors with metal trim

Clear Height
2.4m

Floor
Vct tile

Walls
Painted concrete block

Ceilings
Exposed open web joists

Doors & Trim
Solid core doors with metal trim

Clear Height
2.5m

Remainder:
Floor
Carpet and vct tile

Walls
Painted gyproc

Ceilings
Suspended ‘T’ bar with acoustic tile

Doors & Trim
Solid core doors with metal trim

Clear Height
2.4m

Fixtures & Location:
Ground floor
1×7 piece washroom with shower room (4 shower heads)
1×6 piece washroom with shower room (4 shower heads)
4 stainless steel sinks in kitchen
1 drinking fountain in corridor

Second floor
1×5 piece washroom
1×4 piece washroom

Equipment
Two x 60 gallon John Wood electric hot water heaters

Heating

Type of furnace:
Steam heat supplied from central heat exchanger unit located on site.

Type of radiation:
Finished space: baseboard heaters
Pipe and fab shop and locker rooms: ducted hot air.
Remainder: overhead space heaters

Zoned heating:
All workshops and office areas have separate zones

Supplementary heating:
Locker room: electric baseboard heater
Garage: overhead electric heater with ducted air radiation

Airconditioning A/C
Type of airconditioner:
Air circulation system

Type of radiation:
Ceiling mounted vents

Supplementary ventilation:
Pipe and fab shop: four “smog hog” industrial air cleaning units
Iron workers shop: one “smog hog” industrial air cleaning units

Electrical
Service entrance:
Three phase, 600v,225amps

Fixtures:
Finished space: recessed fluorescent lighting
Unfinished space: woodworking shop – fluorescent
Remainder – incandescent

Sprinkler System
Type: Wet charged system throughout

Fire Protection
Sensors: Smoke sensors throughout
Pull stations: Throughout
Fire alarm panel: “Edwards of Canada” – located on ground floor entrance

Elevators
None

Fixed Equipment
Type: One “Munck gantry
Size (capacity): Ten ton
Location: Pipe and fab shop